A Star DecoratorsCall

Free PDF · for FM, estate and operations teams

The seven questions before a single trading hour is lost.

A two page pre mobilisation checklist for warehouse, distribution centre and retail operations teams. Print it. Mark it up. Send it back to whoever is pricing the coating works. Free, ungated past your name and email. No mailing list.

What's inside

Two pages. Seven decisions. Designed to be marked up.

  • Zone definition: what gets coated, what stays live
  • Shift overlap windows: when the team can actually work
  • Racking interaction: empty, sheet, or coat around
  • Intumescent vs decorative split: different programmes
  • Handover cadence: daily, area by area, or end of job
  • Snags: how they are logged and who signs each area off
  • Communication chain: one name on each side

Written by Tomas Nejedly (Managing Director) and Pawel Kalisiak (Director). We use the same checklist on our own jobs where the site stays open. We are CHAS accredited, with £10m Employers' Liability and £5m Public Liability cover.

Download · free PDF

Live site coating downtime checklist

We email a private download link, valid 24 hours. No mailing list unless you opt in elsewhere.

CallGet a quote

May Google and LinkedIn set cookies to measure our adverts and show them on other sites? If not, none are set (Google still gets basic visit details without cookies). Cookie policy