Commercial decorating · live & occupied sites
Right now we're on Primark and Tesco stores for R.G. Carter and Morris & Spottiswood. Mostly nights, always around trading. Retail refurbishments, fit-outs and planned maintenance, with full RAMS and the brand spec followed.
Live site
You keep trading
Brand colours
Matched to your spec
CHAS
Accredited delivery
UK-wide
South of England base
Working with
In environments
What you get
We are not the cheapest decorator on your list. We are the one with a no-snag handover policy and paperwork that lands on the day it is due.
Quick answers
01 / service
02 / why it matters
On a live commercial site the finish is the easy part. The risk is in the programme, the brand spec and the handover.
A decorator who can't work nights forces closures the business can't afford. Out-of-hours delivery is built into how we price and programme.
An eyeballed colour ages differently across an estate. We work to the brand specification and a confirmed dry film thickness.
When other trades run late, the decorator absorbs it. We hold the programme and flag impacts in writing before it becomes a problem.
Snags found at handover kill the programme. Our site supervisor maintains the snag list live, room by room. Nothing sits until the last day.
03 / process
Walk the scope with the PC. Moisture readings on suspect substrates, cross-hatch adhesion test on existing finishes, photo log of every elevation. Programme overlay with other trades captured on the day.
Dulux Trade primers + Diamond Matt or Sheen 4-coat system as standard. Sheen level per area, colour matched to the brand, dry film thickness specified per coat.
RAMS pack written for the project with COSHH for every product, dust-curtaining strategy, out-of-hours method and PPE matrix. Signed off by site management before mobilisation.
Phase by phase: masking goes up before paint comes out of the kettle. Daily clean-down. Snag list maintained live by the site supervisor.
Walk-the-line with the PC, photo handover record, no-snag handover, paint touch-up kit left on site, decant labels on any leftover product.
04 / sectors
Store refurbishments and rolling estate programmes for Primark, Tesco and M&S via R.G. Carter and Morris & Spottiswood. Delivered around trading hours.
Repaints, refurbishments and dilapidations phased around occupied floors, evenings and weekends.
Low-disruption decorating around term times and operating hours, to the compliance standards these sectors require.
Sympathetic finishes on period buildings through to high-bay warehouses and distribution centres.
Scope · included
Scope · not included
Recent work
Commercial decorating delivered on a live Primark store under a main-contractor framework, phased around trading, finished to the brand specification throughout, and handed over to programme.
Frequently asked
“RAMS in our hands 48 hours before mobilisation, supervisor on site every morning, and the snag list closed within a working week. That's the loop we expect from a tier-1 and rarely get from a decorator at this scale.”
Request a site survey
Location, scope, programme dates and the main contractor if there is one. We typically reply within one working day with a site-survey window.