For the QS and commercial director
A director walks the site. RAMS land five working days before mobilisation. A supervisor is on site every morning. Paperwork arrives on the day it’s due. Handover with every snag closed. This is the commercial loop we run on every framework job. Forward this page to whoever signs off the PSL.
Process
01
You send the scope. A director reviews it and replies within one working day.
02
The director who will sign the paperwork walks the site. Moisture readings, access notes, programme overlay with other trades.
03
Priced scope with prelims as a separate line. Variations priced as we go and agreed in writing before delivery. No bundled rates.
04
RAMS pack written for the project with COSHH for every product, issued five working days before mobilisation. Signed off before works start. Never retrofitted.
05
Supervisor on site every morning. Daily clean down. Photo handover per zone as each area completes. The snag list is maintained live, not saved for the last day.
06
The payment application lands on the day it's due. Variations shown line item. Certificates attached.
07
Snag list cleared before practical completion sign off, subject to access.
08
O&M documentation with the full product record, and the intumescent certificate where an approved system is applied.
Monday rhythm
No chasing. That is what quietly competent looks like in practice.
Client input
If something changes mid programme, tell us early and we absorb it.
Quick answers
Next step
A director reviews it and replies within one working day. Survey usually booked inside 48 hours. Priced scope and RAMS pack within five working days of the survey.
We use cookies to measure how the site performs and to improve our advertising. You can accept these, or reject and we'll only keep what's needed for the site to work. See our cookie policy and privacy policy.