A Star Decorators

01 / decorating

Commercial decorating for live sites that keep trading.

Decorating packages for retail refurbishments, fit-outs and maintenance, delivered while the unit keeps trading with pre-mobilisation RAMS pack and clean handover.

Commercial decorating. A Star Decorators

When this is the right route

  • The site needs to keep trading through the works.
  • Multiple trades are sharing the programme and your decorator has to absorb their slippage.
  • Brand consistency across the estate matters as much as the finish itself.

Scope · included

  • RAMS, COSHH and method statements
  • Out-of-hours and phased shifts
  • Brand-matched specifications
  • Snagging and handover record

Scope · not included

  • Structural alterations
  • M&E works
  • Permanent signage manufacture

Sectors

  • Retail
  • Office
  • Education
  • Healthcare
  • Heritage
  • Logistics

Process

  1. 01

    Survey

    Walk the scope with the PC. Moisture readings on suspect substrates, cross-hatch adhesion test on existing finishes, photo log of every elevation. Programme overlay with other trades captured on the day.

  2. 02

    Specification

    Dulux Trade primers + Diamond Matt or Sheen 4-coat system as standard. Sheen level per area (matt to back-of-house, sheen-eggshell to shopfloor, satin to skirtings). Brand-matched colour, dry film thickness specified per coat.

  3. 03

    RAMS

    Project specific RAMS pack with COSHH for every product, dust curtaining strategy, out of hours method and PPE matrix. Signed off by our site management team before mobilisation.

  4. 04

    Delivery

    Phase-by-phase, masking goes up before paint comes out of the kettle. Daily clean-down. Snag list maintained live by site supervisor. Not retrofitted at end.

  5. 05

    Handover

    Walk-the-line with PC, photo handover record, paint touch-up kit left on site. Decant labels for any leftover product.

Primark · Hammersmith. retail project by A Star Decorators

On the books

Primark · Hammersmith

Kings Mall, London W6 · Uplands Retail

Case study

Primark · Hammersmith

Kings Mall, London W6 · Retail

Active Primark Hammersmith decorating package under Uplands Retail. The live register shows site start 15/04/2026, end 30/05/2026, PO received and a 50% milestone AFP sent on 11/05/2026.

This case study supports searches for live-site commercial decorating, retail refurbishment, on-site spraying and aluminium frame restoration by showing the kind of programme, access and handover constraints A Star Decorators handles for national estate clients.

Read project →

Built for the people who buy decorating

Three audiences. One delivery model.

We are a specialist sub-contractor, not a turnkey fit-out outfit. We deliver decorating, spraying, restoration and coatings under main contractors and direct estate teams.

For main contractors

Hands on decorating. On time, every time, snags closed before handover.

Variations priced ahead of the request. Per-store handover record. AFPs delivered on the day they're due. We run the way you run.

  • Active main-contractor framework relationships
  • Variations priced ahead of the request, AFPs on the day they are due
  • Per zone handover record across multi store programmes

For estate + FM teams

Live trading stays live. Restoration before replacement.

Survey to handover without closing the unit. Powder-coat restoration with a 5-7 year service life. Run-off, masking and reopening tracked store-by-store.

  • Out-of-hours + phased delivery on rolling estate programmes
  • Photo-led handover record per store / per elevation
  • DOFF, chemical and jet-wash cleaning ahead of any coating

For retail estate leads

Brand consistency, store by store, on the date you promised.

Brand-matched paint stacks against the estate spec. KPI reporting per store. Programme that survives shopfit slippage instead of inheriting it.

  • Multi-store rolling programmes. KPI reported nightly
  • Brand-matched Dulux Trade specifications
  • Repeat-work relationships across Primark · Tesco · M&S

How we deliver

Built for live UK sites.

Twenty years finishing commercial buildings across the UK. Director led, directly employed crews, one programme and one point of contact from survey to handover.

01

Live trading hours

Stores stay open. Surveys, masking and run off planned around foot traffic.

02

Out of hours nights

Night programmes on retail and hospitality estates. Clean before doors open.

03

Phased estate rollouts

Rolling 4 to 12 stores a week against a national programme.

04

UK wide coverage

Offices in Poole and London. Crews mobilised across England, Scotland and Wales.

05

Single source delivery

Decorating, on site spraying, powder coat restoration and floor coatings under one PM.

06

Photographic handover

Before and after record, gloss readings and written service life on every scheme.

Frequently asked

  • What sectors do you cover?

    Retail, office, education, healthcare, heritage and logistics. Most of our programme is repeat work for main contractors and retail estates teams.

  • Can you work out-of-hours?

    Yes. Night shifts, early starts and phased shifts are part of how we deliver around live trading. Programme is agreed before mobilisation.

  • Do you produce RAMS?

    A project-specific RAMS pack ships before mobilisation. COSHH assessments for every product. PC sign-off required before works start.

  • What accreditations do you hold?

    CHAS, PAS91 and Site Safety Plus. Dulux Academy trained. Certificates available on request.

  • How do you cost variations?

    Variations are priced as we go, agreed in writing before delivery, and shown line-item on the AfP.

Start a conversation

Send photos, drawings or a short scope.

We will review the service route, access, preparation, finish and likely next step before the job is priced properly.