A Star Decorators

03 / spraying

Controlled on-site spraying for ceilings, walls and cladding.

HVLP and airless spraying for commercial ceilings, walls, glazing, doors and cladding, with full masking and live-site mobilisation.

On-site spraying. A Star Decorators

When this is the right route

  • Brush-and-roll won't reach the finish standard required.
  • The substrate is large or repetitive and roller marks would show.
  • The programme requires shift-pattern delivery rather than slow craft.

Scope · included

  • HVLP and airless capability
  • Full polythene masking and dust-curtaining
  • Extraction strategy for live-site work
  • Finish samples before mobilisation

Scope · not included

  • Powder coating (off-site)
  • Structural repair
  • Cladding manufacture

Sectors

  • Retail
  • Logistics
  • Industrial
  • Education
  • Healthcare

Process

  1. 01

    Survey

    Access (mast / scissor / scaffold), substrate type, adjacent glazing exposure, extraction need. Sample cut on substrate where finish standard is critical.

  2. 02

    Specification

    HVLP for control on detail and edges, airless for repetitive coverage. Agreed dry film thickness per coat. Sheen level confirmed against client sample before mobilisation.

  3. 03

    RAMS

    Full polythene masking schedule, dust-curtain locations, extraction plan, respirator matrix, exclusion zones during atomisation.

  4. 04

    Delivery

    Mask, sample-cut for client approval, spray in phases, demask each phase before the next starts. Adjacent finishes inspected at demask.

  5. 05

    Handover

    Walk-the-line, snag, sign-off. Film-thickness check at random sample points where the spec calls for it.

M&S · Poole. spraying project by A Star Decorators

On the books

M&S · Poole

Poole Road, Poole BH12 · Morris & Spottiswood

Case study

M&S · Poole

Poole Road, Poole BH12 · Spraying

Active M&S Poole package under Morris & Spottiswood. The live summary shows site start 01/04/2026, end 20/05/2026, signed subcontract received and one paid application on file.

This case study supports searches for live-site commercial decorating, retail refurbishment, on-site spraying and aluminium frame restoration by showing the kind of programme, access and handover constraints A Star Decorators handles for national estate clients.

Read project →

Built for the people who buy decorating

Three audiences. One delivery model.

We are a specialist sub-contractor, not a turnkey fit-out outfit. We deliver decorating, spraying, restoration and coatings under main contractors and direct estate teams.

For main contractors

Hands on decorating. On time, every time, snags closed before handover.

Variations priced ahead of the request. Per-store handover record. AFPs delivered on the day they're due. We run the way you run.

  • Active main-contractor framework relationships
  • Variations priced ahead of the request, AFPs on the day they are due
  • Per zone handover record across multi store programmes

For estate + FM teams

Live trading stays live. Restoration before replacement.

Survey to handover without closing the unit. Powder-coat restoration with a 5-7 year service life. Run-off, masking and reopening tracked store-by-store.

  • Out-of-hours + phased delivery on rolling estate programmes
  • Photo-led handover record per store / per elevation
  • DOFF, chemical and jet-wash cleaning ahead of any coating

For retail estate leads

Brand consistency, store by store, on the date you promised.

Brand-matched paint stacks against the estate spec. KPI reporting per store. Programme that survives shopfit slippage instead of inheriting it.

  • Multi-store rolling programmes. KPI reported nightly
  • Brand-matched Dulux Trade specifications
  • Repeat-work relationships across Primark · Tesco · M&S

How we deliver

Built for live UK sites.

Twenty years finishing commercial buildings across the UK. Director led, directly employed crews, one programme and one point of contact from survey to handover.

01

Live trading hours

Stores stay open. Surveys, masking and run off planned around foot traffic.

02

Out of hours nights

Night programmes on retail and hospitality estates. Clean before doors open.

03

Phased estate rollouts

Rolling 4 to 12 stores a week against a national programme.

04

UK wide coverage

Offices in Poole and London. Crews mobilised across England, Scotland and Wales.

05

Single source delivery

Decorating, on site spraying, powder coat restoration and floor coatings under one PM.

06

Photographic handover

Before and after record, gloss readings and written service life on every scheme.

Frequently asked

  • How do you control overspray?

    Full polythene masking, dust curtains where airflow allows, and extraction where the site permits. We sample-cut before full coverage.

  • How fast does it dry?

    Depends on the system. Most water-based finishes are touch-dry in 30 minutes and recoatable within 2-4 hours. Solvent systems need longer and we plan around them.

  • Can you spray at height?

    Yes. Mast lifts, scissor lifts and scaffold are standard. Access is agreed at survey.

  • Will glazing be protected?

    Glazing, gaskets and surrounding fixtures are masked before primer. Glass is checked at demask.

  • Can you work during trading?

    Often yes. With the right extraction and shift pattern. Some sites need overnight delivery. We agree the approach at survey.

Start a conversation

Send photos, drawings or a short scope.

We will review the service route, access, preparation, finish and likely next step before the job is priced properly.