A Star Decorators

04 / spraying

Refinish curtain walls and aluminium glazing systems in place.

Curtain walls, window frames and entrance door systems spray refinished on site. Matched RAL or BS finish. No reglazing, no disruption to building occupants.

Aluminium glazing spraying. A Star Decorators

When this is the right route

  • The glazing system is sound but the finish is failing: chalking, fading or inconsistent across the estate.
  • Reglazing is not commercially viable and new manufacture isn't on the programme.
  • A consistent estate finish matters and full replacement won't deliver it in time.

Scope · included

  • Glazing, gasket and ironmongery protection through to demask
  • Substrate preparation, decontamination and tie coat
  • Matched RAL or BS finish
  • System and product record for the surveyed substrate

Scope · not included

  • Glass replacement
  • Frame structural repair
  • New manufacture

Sectors

  • Office
  • Retail
  • Education
  • Hospitality

Process

  1. 01

    Survey

    Confirm glazing system type, substrate condition, RAL reference (gloss meter read on a clean reference panel), adhesion test on existing finish, and access method. Restoration only goes ahead if the substrate holds.

  2. 02

    Specification

    Two pack tie coat over light mechanical abrasion, followed by a matched RAL topcoat. The system is selected for the surveyed substrate, exposure and matching sheen to adjacent panels.

  3. 03

    RAMS

    RAMS written for the project including glazing protection masking method, spray containment plan for public routes, COSHH for tie coat solvents, and access schedule.

  4. 04

    Delivery

    Mask all glazing, gaskets and ironmongery. Prepare, prime and apply within the same shift where access permits. Demask at end of each phase. Glass checked before reopening.

  5. 05

    Handover

    Before/after photo record, gloss reading on completed panels and the specified product record.

Primark · Stevenage (Phase 1). restoration project by A Star Decorators

On the books

Primark · Stevenage (Phase 1)

Town Square, Stevenage · R.G. Carter Projects Ltd

Case study

Primark · Stevenage (Phase 1)

Town Square, Stevenage · Restoration

A seven week external facade phase at Primark's Stevenage town centre store under R.G. Carter, combining facade redecoration with specialist surface treatments. Phase 1 completed in June 2026, with four variations approved in writing and the milestone payment application certified in full.

This case study supports searches for live site commercial decorating, retail refurbishment, spraying on site and aluminium frame restoration by showing the kind of programme, access and handover constraints A Star Decorators handles for national estate clients.

Read project →

Built for the people who buy decorating

Three audiences. One delivery model.

We are a specialist subcontractor, not a turnkey fit out outfit. We deliver decorating, spraying, restoration and coatings under main contractors and direct estate teams.

For main contractors

Hands-on decorating, phased around live sites.

Variations agreed in writing before delivery. Per-store handover record. Snag status tracked through to sign-off.

  • Active main contractor framework relationships
  • Variations priced and agreed in writing before delivery
  • Per zone handover record across multi store programmes

For estate + FM teams

Live trading stays live. Restoration before replacement.

Survey to handover without closing the unit. Powder coat restoration is specified to the surveyed substrate. Run off, masking and reopening tracked store by store.

  • Out of hours + phased delivery on rolling estate programmes
  • Photo led handover record per store / per elevation
  • DOFF, chemical and jet wash cleaning ahead of any coating

For retail estate leads

Brand consistency, store by store, against the agreed programme.

Brand-matched paint systems against the estate spec. Progress and handover records per store. Programme moves flagged and resequenced with the site team.

  • Multi-store rolling programmes with per-store records
  • Brand matched Dulux Trade specifications
  • Repeat work relationships across Primark · Tesco · M&S

Find the right route

Domestic, retail or industrial.

Most visitors arrive with a sector problem before they know the coating system. These routes match the way buyers search: home and residential work, retail fit out programmes, and industrial painting or warehouse coatings.

How we deliver

Built for live UK sites.

Twenty years finishing commercial buildings across the UK. Director led, the same trusted crews, one programme and one point of contact from survey to handover.

01

Live trading hours

Stores stay open. Surveys, masking and run off planned around foot traffic.

02

Out of hours nights

Night programmes on retail and hospitality estates. Clean before doors open.

03

Phased estate rollouts

Rolling store programmes sequenced against the main contractor plan.

04

UK wide coverage

Poole operational base. Framework crews mobilised across the UK.

05

Single source delivery

Decorating, on site spraying, powder coat restoration and floor coatings under one PM.

06

Photographic handover

Before and after record, sign-off notes and the specified product record.

Frequently asked

  • Is the glass protected throughout?

    Glazing, gaskets, ironmongery and sealants are masked before primer goes on. Glass is inspected at demask before any floor or wing reopens.

  • Will it last as long as factory powder coat?

    It is a different system from a factory powder coat. Suitability and durability depend on the existing finish, preparation, exposure and selected products, so we only state supported performance terms after survey.

  • Can it be done while the building is occupied?

    Yes. Most schemes are delivered phased, floor by floor or elevation by elevation, with each section reopened as we demask.

  • Can you match a faded or inconsistent RAL?

    Yes. We sample on site and match to the current colour, not factory fresh. Where estate consistency is the goal, a single reference colour is agreed and applied across the whole scheme.

  • How long until staff can open the windows?

    Touch dry within an hour; full cure varies by system. We agree the no touch window at survey and leave it on the handover sheet.

Start a conversation

Send photos, drawings or a short scope.

We will review the service route, access, preparation, finish and likely next step before the job is priced properly.

CallGet a quote