Aluminium glazing spraying · Reading
Curtain walls, window frames and entrance door systems spray-refinished on site. Matched RAL or BS finish. No reglazing, no disruption to building occupants. Delivered across Reading and Thames Valley. Commercial and office decorating across Reading and the Thames Valley. Green Park, Thames Valley Park and the M4 business parks drive a programme of corporate fit-out, on-site spraying of partitions and joinery, and decoration phased around occupied office floors.
Why Reading
Track record
Right fit when
Scope · included
Sectors · Reading
Reading programme
01 · Survey
Confirm glazing system type, substrate condition, RAL reference (gloss-meter read on a clean reference panel), adhesion test on existing finish, and access method. Restoration only goes ahead if the substrate holds.
02 · Specification
Two-pack tie-coat over light mechanical abrasion, matched RAL topcoat at 60-80 µm. System selected for UV stability and matching sheen to adjacent panels. Service-life expectation written into the spec.
03 · RAMS
Project-specific RAMS including glazing-protection masking method, spray-containment plan for public routes, COSHH for tie-coat solvents, and access schedule.
04 · Delivery
Mask all glazing, gaskets and ironmongery. Prepare, prime and apply within the same shift where access permits. Demask at end of each phase. Glass checked before reopening.
05 · Handover
Before/after photo record, gloss reading on completed panels, written service-life note per scheme.
Frequently asked · Reading
Also in Reading
Recent work
Start a conversation
We will review the service route, access, preparation, finish and likely next step before the job is priced properly.