Option 01
Restoration on site
Keep the existing aluminium in place. Strip the surface, prime, recoat to a matched RAL. No reglazing, no scaffold closure of the entrance.
Where it wins
- Keeps sound frames, glazing and gaskets in place
- Works around live trading. No store closure
- System selected after substrate testing
- No planning consent. No new manufacture lead time
- Glass, gaskets, ironmongery stay in place
Trade offs
- Substrate has to be sound. We flag failure at survey
- Service life shorter than a brand new factory powder coat
- Some patch repair shows under raking light if the original was severe
- Indicative cost
- Survey-priced from frame condition, access, masking and measured scope
- Service life
- System and substrate dependent; manufacturer terms vary by specification
