Interior decorating · Leeds
Interior walls, ceilings, joinery and detail decorating for retail, hospitality, healthcare and education. Finish-led, not race-to-the-line. Delivered across Leeds and Yorkshire. Commercial decorating and industrial coatings across Leeds and Yorkshire.
Scope · included
Leeds programme
01 · Survey
Substrate walk. Plasterboard, MDF, exposed steel, masonry. Designer spec reviewed, any ambiguity flagged in writing. Sample finish requirement agreed.
02 · Specification
Stack per surface: walls in Diamond Matt or Sheen 4, joinery in Quick Dry Eggshell, steel in two-pack where exposure demands it. Sheen levels agreed against samples.
03 · RAMS
Project-specific RAMS. Dust control, COSHH for any solvent products, masking schedule. Issued before mobilisation.
04 · Delivery
Phase by surface: masking, prep, prime, top-coats, demask. Designer / PC walks the line at each phase, not just at end.
05 · Handover
Photo record, touch-up kit, dry-film record where two-pack systems were used. Snag close-out within 48h.
Frequently asked · Leeds
Start a conversation
We will review the service route, access, preparation, finish and likely next step before the job is priced properly.