A Star Decorators

12 / decorating

Commercial interior decorating across UK estates.

Interior walls, ceilings, joinery and detail decorating for retail, hospitality, healthcare and education. Finish-led, not race-to-the-line.

Interior decorating. A Star Decorators

When this is the right route

  • The finish needs to read as 'designed', not just painted.
  • Multiple surface types share the room (drywall, joinery, steel, masonry) and need coordinated handling.
  • The PC needs a decorator that survives QS scrutiny on the final inspection.

Scope · included

  • Wall, ceiling, joinery and detail decorating
  • Substrate-matched paint stack (water-based, oil-based, two-pack)
  • Brand and designer specifications honoured
  • Snagging and handover record

Scope · not included

  • Plasterboarding and skim
  • First fix carpentry
  • Wall covering / vinyl installation

Sectors

  • Retail
  • Hospitality
  • Healthcare
  • Education
  • Office

Process

  1. 01

    Survey

    Substrate walk. Plasterboard, MDF, exposed steel, masonry. Designer spec reviewed, any ambiguity flagged in writing. Sample finish requirement agreed.

  2. 02

    Specification

    Stack per surface: walls in Diamond Matt or Sheen 4, joinery in Quick Dry Eggshell, steel in two-pack where exposure demands it. Sheen levels agreed against samples.

  3. 03

    RAMS

    Project-specific RAMS. Dust control, COSHH for any solvent products, masking schedule. Issued before mobilisation.

  4. 04

    Delivery

    Phase by surface: masking, prep, prime, top-coats, demask. Designer / PC walks the line at each phase, not just at end.

  5. 05

    Handover

    Photo record, touch-up kit, dry-film record where two-pack systems were used. Snag close-out within 48h.

Premier Inn · R.G. Carter framework. retail project by A Star Decorators

On the books

Premier Inn · R.G. Carter framework

UK · R.G. Carter Projects Ltd

Case study

Premier Inn · R.G. Carter framework

UK · Retail

Premier Inn hotel decoration package delivered through the R.G. Carter framework. Guest-room, corridor, BOH and exterior decoration to the brand specification.

This case study supports searches for live-site commercial decorating, retail refurbishment, on-site spraying and aluminium frame restoration by showing the kind of programme, access and handover constraints A Star Decorators handles for national estate clients.

Read project →

Built for the people who buy decorating

Three audiences. One delivery model.

We are a specialist sub-contractor, not a turnkey fit-out outfit. We deliver decorating, spraying, restoration and coatings under main contractors and direct estate teams.

For main contractors

Hands on decorating. On time, every time, snags closed before handover.

Variations priced ahead of the request. Per-store handover record. AFPs delivered on the day they're due. We run the way you run.

  • Active main-contractor framework relationships
  • Variations priced ahead of the request, AFPs on the day they are due
  • Per zone handover record across multi store programmes

For estate + FM teams

Live trading stays live. Restoration before replacement.

Survey to handover without closing the unit. Powder-coat restoration with a 5-7 year service life. Run-off, masking and reopening tracked store-by-store.

  • Out-of-hours + phased delivery on rolling estate programmes
  • Photo-led handover record per store / per elevation
  • DOFF, chemical and jet-wash cleaning ahead of any coating

For retail estate leads

Brand consistency, store by store, on the date you promised.

Brand-matched paint stacks against the estate spec. KPI reporting per store. Programme that survives shopfit slippage instead of inheriting it.

  • Multi-store rolling programmes. KPI reported nightly
  • Brand-matched Dulux Trade specifications
  • Repeat-work relationships across Primark · Tesco · M&S

How we deliver

Built for live UK sites.

Twenty years finishing commercial buildings across the UK. Director led, directly employed crews, one programme and one point of contact from survey to handover.

01

Live trading hours

Stores stay open. Surveys, masking and run off planned around foot traffic.

02

Out of hours nights

Night programmes on retail and hospitality estates. Clean before doors open.

03

Phased estate rollouts

Rolling 4 to 12 stores a week against a national programme.

04

UK wide coverage

Offices in Poole and London. Crews mobilised across England, Scotland and Wales.

05

Single source delivery

Decorating, on site spraying, powder coat restoration and floor coatings under one PM.

06

Photographic handover

Before and after record, gloss readings and written service life on every scheme.

Frequently asked

  • Can you work to a designer's spec?

    Yes. We read the schedule, query ambiguities in writing, sample-cut before full coverage. We never substitute a paint without designer sign-off.

  • What about joinery in oil-based finish?

    Quick Dry Eggshell water-based is standard now. Same hardness, no yellowing, dry within 4 hours. Traditional oil-based available if the spec calls for it.

  • Can you do bespoke colour matching?

    Yes. Pantone or RAL on site, sampled and signed-off before mobilisation. We carry mixing kit for site adjustments.

  • How do you handle exposed steel?

    Two-pack epoxy or PU systems for industrial environments, water-based hard wearing for indoor commercial. Specification-led by exposure class.

  • Snagging policy?

    Live snag list maintained by site supervisor. 48-hour close-out post-handover for anything raised at sign-off.

Start a conversation

Send photos, drawings or a short scope.

We will review the service route, access, preparation, finish and likely next step before the job is priced properly.