Office decorating · Oxford
Office repaints, refurbishments and dilapidations delivered evenings, weekends and closures so the workforce keeps working. Low-VOC as standard. CHAS-accredited. Delivered across Oxford and Oxfordshire. Facade cleaning, restoration and commercial decorating across Oxford. A city of college stone, listed frontages and the Westgate retail estate. Heritage-safe DOFF cleaning, sympathetic restoration of period metalwork, and retail and commercial decorating worked around a tight, pedestrianised centre.
Why Oxford
Track record
Right fit when
Scope · included
Sectors · Oxford
Oxford programme
01 · Survey
Out-of-hours site visit where possible. Occupancy pattern captured, key-cycle agreed with FM, alarm-code coordination confirmed. Furniture move requirement assessed, priced separately if material.
02 · Specification
Low-VOC stack as standard (Dulux Trade Diamond Matt and Quick Dry Eggshell) so working areas reopen without odour. Brand colours sample-cut on the actual substrate before mobilisation.
03 · RAMS
After-hours method statement: alarm code coordination, security sign-in/out, lone-working procedure, fire-route maintenance during works. Issued to FM 48 hours ahead of first shift.
04 · Delivery
Friday-evening-to-Monday-morning is the typical shift pattern. Furniture sheeted, floors protected, surfaces wiped down before staff return. Daily reset for any zone that flips back into use mid-programme.
05 · Handover
Photo record, paint touch-up kit left with FM, debrief if a dilapidations condition report is required for the surveyor.