A Star Decorators

11 / decorating

Office decorating that works around occupancy.

Phased office repaints, refurbishments and dilapidations works delivered evenings, weekends and holidays so the workforce keeps working.

Office decorating. A Star Decorators

When this is the right route

  • The office can't shut down for a refresh. Work has to fit around the workforce.
  • Dilapidations or move-in repaints need a fixed handover date.
  • Brand or interior design firm has issued a spec and you need it executed properly.

Scope · included

  • Out-of-hours delivery (evenings, weekends, holiday closures)
  • Low-VOC and low-odour paint specifications
  • Furniture moves and floor protection
  • Pre- and post-clean for working areas

Scope · not included

  • IT moves and re-cabling
  • Furniture supply or assembly
  • Carpet and flooring works

Sectors

  • Office
  • Workplace
  • Professional Services
  • Tech

Process

  1. 01

    Survey

    Out-of-hours site visit if possible, occupancy pattern captured, key-cycle agreed with FM. Furniture move requirement priced separately if material.

  2. 02

    Specification

    Low-VOC stack as standard (Dulux Trade Diamond Matt + Quick Dry Eggshell) so working areas reopen without odour. Brand colours sample-cut before mobilisation.

  3. 03

    RAMS

    After-hours method. Alarm code coordination, security sign-in/out, lone-working procedure, fire-route maintenance. Issued to FM 48h ahead.

  4. 04

    Delivery

    Friday-evening-to-Monday-morning is the typical shift. Furniture sheeted, floors protected, surfaces wiped before staff return. Daily reset for any zone that handles back into use.

  5. 05

    Handover

    Photo record, paint touch-up kit left with FM, debrief if dilapidations report is required for lease handover.

Built for the people who buy decorating

Three audiences. One delivery model.

We are a specialist sub-contractor, not a turnkey fit-out outfit. We deliver decorating, spraying, restoration and coatings under main contractors and direct estate teams.

For main contractors

Hands on decorating. On time, every time, snags closed before handover.

Variations priced ahead of the request. Per-store handover record. AFPs delivered on the day they're due. We run the way you run.

  • Active main-contractor framework relationships
  • Variations priced ahead of the request, AFPs on the day they are due
  • Per zone handover record across multi store programmes

For estate + FM teams

Live trading stays live. Restoration before replacement.

Survey to handover without closing the unit. Powder-coat restoration with a 5-7 year service life. Run-off, masking and reopening tracked store-by-store.

  • Out-of-hours + phased delivery on rolling estate programmes
  • Photo-led handover record per store / per elevation
  • DOFF, chemical and jet-wash cleaning ahead of any coating

For retail estate leads

Brand consistency, store by store, on the date you promised.

Brand-matched paint stacks against the estate spec. KPI reporting per store. Programme that survives shopfit slippage instead of inheriting it.

  • Multi-store rolling programmes. KPI reported nightly
  • Brand-matched Dulux Trade specifications
  • Repeat-work relationships across Primark · Tesco · M&S

How we deliver

Built for live UK sites.

Twenty years finishing commercial buildings across the UK. Director led, directly employed crews, one programme and one point of contact from survey to handover.

01

Live trading hours

Stores stay open. Surveys, masking and run off planned around foot traffic.

02

Out of hours nights

Night programmes on retail and hospitality estates. Clean before doors open.

03

Phased estate rollouts

Rolling 4 to 12 stores a week against a national programme.

04

UK wide coverage

Offices in Poole and London. Crews mobilised across England, Scotland and Wales.

05

Single source delivery

Decorating, on site spraying, powder coat restoration and floor coatings under one PM.

06

Photographic handover

Before and after record, gloss readings and written service life on every scheme.

Frequently asked

  • Can the office stay open during works?

    Usually yes. We work evenings, weekends and over closure periods. Some scopes need zoning rather than full out-of-hours. Agreed at survey.

  • Will the paint smell on Monday morning?

    No. Standard spec is low-VOC water-based. Walls are touch-dry within 30 minutes and recoatable within 2-4 hours. Odour-free by working hours next day.

  • Can you handle dilapidations?

    Yes. Pre-paint condition report, final repaint to lease standard, photo handover for the surveyor. Common scope for move-out and move-in alike.

  • Do you move furniture?

    Light furniture sheeted and shifted within room. Significant moves priced separately or coordinated with a removals partner.

  • What about brand colours?

    RAL- or Pantone-matched on site, sampled before mobilisation. Brand guidelines packs accepted as standard.

Start a conversation

Send photos, drawings or a short scope.

We will review the service route, access, preparation, finish and likely next step before the job is priced properly.