Aluminium glazing spraying · Bristol
Curtain walls, window frames and entrance door systems spray-refinished on site. Matched RAL or BS finish. No reglazing, no disruption to building occupants. Delivered across Bristol and South West. Commercial decorating, frame restoration and facade cleaning across Bristol and the wider South West. Cabot Circus and Cribbs Causeway retail through to harbourside offices and the city's stock of painted render and stone. Much of it in conservation areas.
Why Bristol
Track record
Right fit when
Scope · included
Sectors · Bristol
Bristol programme
Confirm glazing system type, substrate condition, RAL reference (gloss-meter read on a clean reference panel), adhesion test on existing finish, and access method. Restoration only goes ahead if the substrate holds.
Two-pack tie-coat over light mechanical abrasion, matched RAL topcoat at 60-80 µm. System selected for UV stability and matching sheen to adjacent panels. Service-life expectation written into the spec.
RAMS written for the project including glazing protection masking method, spray containment plan for public routes, COSHH for tie-coat solvents, and access schedule.
Mask all glazing, gaskets and ironmongery. Prepare, prime and apply within the same shift where access permits. Demask at end of each phase. Glass checked before reopening.
Before/after photo record, gloss reading on completed panels, written service life note per scheme.
Frequently asked · Bristol
Also in Bristol
Recent work
Start a conversation
We will review the service route, access, preparation, finish and likely next step before the job is priced properly.