Powder coated frame restoration · Bristol
Faded shopfronts, curtain walls and entrance frames recovered to a matched RAL or BS finish, carried out around live trading with a 5-7 year expected service life. Delivered across Bristol and South West. Commercial decorating, frame restoration and facade cleaning across Bristol and the South West.
Scope · included
Bristol programme
01 · Survey
Frame-by-frame walk. Gloss-meter reading on a clean reference area, RAL identification via Pantone bridge or direct match. Adhesion test on the existing powder coat. Restoration only goes ahead if the substrate holds.
02 · Specification
PPG / AkzoNobel two-pack tie-coat over light abrasion, matched RAL topcoat at 60-80 µm. Service-life expectation written into the spec, not implied.
03 · RAMS
Masking method for glazing, gaskets and signage. Spray containment if the frame is exposed to public route. COSHH for tie-coat solvents.
04 · Delivery
Prepare, mask, prime, apply, demask the same shift where access permits. Glazing checked at demask. Adjacent finishes wiped before public reopening.
05 · Handover
Before/after photo record, gloss reading on completed work, written service-life note (5-7 years on a sound substrate).
Frequently asked · Bristol
Start a conversation
We will review the service route, access, preparation, finish and likely next step before the job is priced properly.