Interior decorating · Reading
Interior walls, ceilings, joinery and detail work for retail, hospitality, healthcare and education. Designer-spec literate. Substrate-specific paint systems. Two-pack capability where the environment demands it. Delivered across Reading and Thames Valley. Commercial and office decorating across Reading and the Thames Valley. Green Park, Thames Valley Park and the M4 business parks drive a programme of corporate fit-out, on-site spraying of partitions and joinery, and decoration phased around occupied office floors.
Why Reading
Track record
Right fit when
Scope · included
Sectors · Reading
Reading programme
01 · Survey
Substrate walk: plasterboard, MDF, exposed steel, masonry. Designer spec reviewed. Any ambiguity flagged in writing before mobilisation. Sample finish requirement agreed and cut on the actual substrate.
02 · Specification
Stack per surface: walls in Diamond Matt or Sheen 4, joinery in Quick Dry Eggshell, exposed steel in two-pack epoxy or PU where the environment demands it. Sheen levels agreed against physical samples, not RAL codes on paper.
03 · RAMS
Project-specific RAMS: dust control in occupied environments, COSHH for any solvent or two-pack products, masking schedule per surface type. Issued before mobilisation.
04 · Delivery
Phase by surface type: masking, prep, prime, top-coats, demask. Designer or PC walks the line at each phase, not just at practical completion.
05 · Handover
Photo record, touch-up kit, dry-film record where two-pack systems were used. Live snag list closed within 48 hours of sign-off.
Frequently asked · Reading
Also in Reading
Recent work
Start a conversation
We will review the service route, access, preparation, finish and likely next step before the job is priced properly.