A Star Decorators

On-site spraying · London

On-site spraying in London.

HVLP and airless spraying for commercial ceilings, walls, glazing, doors and cladding, with full masking and live-site mobilisation. Delivered across London and Greater London. Commercial decorating, spraying and frame restoration across London. Most of our London programme is night works and phased delivery for retail estates and main contractors.

Scope · included

What you get when you brief us for on-site spraying in London.

  • HVLP and airless capability
  • Full polythene masking and dust-curtaining
  • Extraction strategy for live-site work
  • Finish samples before mobilisation

London programme

How we run on-site spraying schemes locally.

  1. 01 · Survey

    Access (mast / scissor / scaffold), substrate type, adjacent glazing exposure, extraction need. Sample cut on substrate where finish standard is critical.

  2. 02 · Specification

    HVLP for control on detail and edges, airless for repetitive coverage. Agreed dry film thickness per coat. Sheen level confirmed against client sample before mobilisation.

  3. 03 · RAMS

    Full polythene masking schedule, dust-curtain locations, extraction plan, respirator matrix, exclusion zones during atomisation.

  4. 04 · Delivery

    Mask, sample-cut for client approval, spray in phases, demask each phase before the next starts. Adjacent finishes inspected at demask.

  5. 05 · Handover

    Walk-the-line, snag, sign-off. Film-thickness check at random sample points where the spec calls for it.

Frequently asked · London

What clients in London usually ask first.

Are you based in London?
We're a UK contractor with a regular London programme. Mobilisation is typically same-week for London sites.
Can you work out-of-hours?
Yes. Most of our London work is overnight or phased around live trading. The cost model assumes night works.
What about congestion charge and ULEZ?
All site vehicles are ULEZ-compliant. Congestion charge and parking are part of the cost model, not a variation.
How do you control overspray?
Full polythene masking, dust curtains where airflow allows, and extraction where the site permits. We sample-cut before full coverage.
How fast does it dry?
Depends on the system. Most water-based finishes are touch-dry in 30 minutes and recoatable within 2-4 hours. Solvent systems need longer and we plan around them.
Can you spray at height?
Yes. Mast lifts, scissor lifts and scaffold are standard. Access is agreed at survey.
Will glazing be protected?
Glazing, gaskets and surrounding fixtures are masked before primer. Glass is checked at demask.
Can you work during trading?
Often yes. With the right extraction and shift pattern. Some sites need overnight delivery. We agree the approach at survey.

Start a conversation

Send photos, drawings or a short scope.

We will review the service route, access, preparation, finish and likely next step before the job is priced properly.