On-site spraying · Swindon
A factory-grade spray finish, done on site without taking anything out. HVLP for control on the detail and edges, airless for the big repetitive runs. Full polythene masking and live-site extraction so the rest of the building keeps working. Delivered across Swindon and Wiltshire. Warehouse coatings, resin floors and industrial decorating across Swindon. The town's distribution and logistics estates along the M4, and the manufacturing units that came with them, are the core of the programme. Live-site wall and steel coatings, epoxy floors specified to forklift traffic, all delivered zone by zone.
Why Swindon
Track record
Right fit when
Scope · included
Sectors · Swindon
Swindon programme
01 · Survey
Access method (mast, scissor, scaffold), substrate type, adjacent glazing exposure, extraction requirement. Sample cut on substrate where finish standard is critical, agreed in writing before mobilisation.
02 · Specification
HVLP for control on detail and edges; airless for repetitive large coverage. Agreed dry film thickness per coat. Sheen level confirmed against a physical sample on the actual substrate.
03 · RAMS
Full polythene masking schedule, dust-curtain locations, extraction plan, respirator matrix, exclusion zones during atomisation. Public routes and adjacent occupied areas called out specifically.
04 · Delivery
Mask, sample-cut for client approval, spray in phases, demask each phase before the next starts. Adjacent finishes inspected at demask. No open-overnight masking left on live glazing.
05 · Handover
Walk-the-line, snag, sign-off. Film-thickness check at random sample points where the spec calls for it. Photo record of finished elevations.
Frequently asked · Swindon
Also in Swindon
Start a conversation
We will review the service route, access, preparation, finish and likely next step before the job is priced properly.