A Star Decorators

Warehouse and industrial coatings · Swindon

Industrial coatings in Swindon.

We coat warehouses without shutting them down. Walls, steelwork, high bays, one zone at a time, around your shifts. Intumescent protection on structural steel where the fire rating needs it. Delivered across Swindon and Wiltshire. Warehouse coatings, resin floors and industrial decorating across Swindon, for the distribution and logistics estates along the M4 and the manufacturing units that came with them. Wall and steel coatings, and epoxy floors specified to forklift traffic, done one zone at a time while the site keeps working.

Why Swindon

Why choose us for warehouse and industrial coatings in Swindon and Wiltshire.

Track record

  • Racking stays in place and the site keeps operating around us, one zone at a time
  • Intumescent paint applied using manufacturer-certified systems
  • A handover and record for every zone, not a single sign off at the end of the job

Right fit when

  • The site needs to keep operating throughout. Shutting down is not an option.
  • Structural steelwork needs intumescent protection or a specialist two pack system.
  • Access spans high bay, racking and overhead conveyors where standard ladders won't reach.

Scope · included

What you get when you brief us for warehouse and industrial coatings in Swindon.

  • Live site zonal and phased delivery
  • Intumescent paint applied using manufacturer-certified systems
  • MEWP and scaffold access planned in RAMS
  • FM coordinated operational planning

Sectors · Swindon

Types of building we cover with warehouse and industrial coatings in Swindon.

  • Logistics
  • Industrial
  • Distribution
  • Manufacturing

Swindon programme

How we run warehouse and industrial coatings schemes locally.

01

Survey

Live site walk with FM: agree zones, shift pattern and exclusion zone boundaries. Capture steel condition (corrosion grade, existing coating system, intumescent requirement). Access method confirmed per bay.

02

Specification

We pick the coating for each area and each type of steel. Structural steel gets an epoxy primer to stop rust and a polyurethane topcoat. Where a fire rating is needed, we use a manufacturer-certified intumescent system. Surfaces that are not structural usually need one fresh coat. We choose a MEWP or scaffold to suit the height of each bay.

03

RAMS

RAMS per zone, covering racking interaction (working over vs. working around), MEWP safe working plan, emergency evacuation with FM, COSHH for two pack catalysts.

04

Delivery

Zone by zone delivery. Each zone is returned to live operations before the next opens. Forklift aisles not shared mid coat. Shift timing agreed with FM weekly.

05

Handover

Each area gets its own handover record with paint thickness readings. Where we use intumescent paint, the manufacturer's certificate goes in the record. Your facilities manager signs off each area before it goes back into full use.

CHAS accreditedCHAS-0024812, valid to 13 January 2027
  • Dulux Academy trained
  • £10m Employers' Liability and £5m Public Liability (AXA, to February 2027)

Frequently asked · Swindon

What clients in Swindon usually ask first.

Can you coat a working distribution centre?
Yes. We phase by zone so picking and dispatch carry on around us, reopening each area before moving to the next.
Do you do warehouse floor coatings?
Yes. Epoxy and polyurethane systems specified to the slab and the traffic load, with the downtime agreed up front, not assumed.
What about access in high bay units?
MEWPs, scaffold and mast climbers as the building needs; agreed at survey alongside the traffic management plan.
Can the warehouse keep operating throughout?
Yes. The whole programme uses zonal delivery so live operations continue around us. Active aisles and adjacent zones stay open.
What paperwork comes with intumescent work?
We apply manufacturer-certified intumescent systems. The manufacturer's certificate goes in your handover record.
What about ATEX zones?
Tell us at survey if any area is an ATEX zone (an area with a risk of explosive gas or dust). We confirm what we can do before we price.
What happens to the racking?
Racking stays in place. We work around it or use MEWPs to reach over. Any racking movement is the FM's decision and is priced separately.
Can forklifts still run during application?
Not in the active zone. We coordinate the exclusion schedule with the FM so forklift routes are maintained in adjacent zones throughout.

Start a conversation

Send us the drawings or a few photos.

Where we can, we check access and the state of the surfaces before we price, so the quote matches the real job. Email drawings to office@astardecorators.com, or send photos on WhatsApp.

CallGet a quote

May Google and LinkedIn set cookies to measure our adverts and show them on other sites? If not, none are set (Google still gets basic visit details without cookies). Cookie policy