Roof, wall and cladding coatings · Reading
TOR and spray combination systems for profile sheet, rainscreen and curtain-wall cladding. DOFF-cleaned substrate, RAL-matched finish. 10-year service-life options on sound metal cladding. Delivered across Reading and Thames Valley. Commercial and office decorating across Reading and the Thames Valley. Green Park, Thames Valley Park and the M4 business parks drive a programme of corporate fit-out, on-site spraying of partitions and joinery, and decoration phased around occupied office floors.
Why Reading
Track record
Right fit when
Scope · included
Sectors · Reading
Reading programme
01 · Survey
Cladding type (profile sheet, cassette, ACM, rainscreen), adhesion test on existing coating, substrate condition, RAL reference, access assessment (roof parapet, elevation height, MEWP reach or scaffold requirement).
02 · Specification
Cleaning method first: DOFF, chemical or pressure wash, matched to substrate. Then primer and topcoat system to service-life target. 10-year options available on sound metal substrates. Sample panel agreed before full application.
03 · RAMS
Project-specific RAMS covering cleaning run-off containment, MEWP or scaffold access plan, edge-protection specification, wind-loading restrictions on spray application, COSHH.
04 · Delivery
Clean substrate, prepare any surface defects, mask glazing and penetrations, prime in passes, apply topcoat. Phased by elevation so the building stays operational throughout.
05 · Handover
As-applied record (product batch, film thickness, weather conditions at application), before/after photo log, written service-life expectation.
Frequently asked · Reading
Also in Reading
Recent work
Start a conversation
We will review the service route, access, preparation, finish and likely next step before the job is priced properly.