A Star Decorators

Interior decorating · London

Commercial interior decorators in London.

Interior walls, ceilings, joinery and detail work for retail, hospitality, healthcare and education. Designer-spec literate. Substrate-specific paint systems. Two-pack capability where the environment demands it. Delivered across London and Greater London. Commercial decorating, on-site spraying and shopfront restoration across London. Most of the London programme is overnight and phased delivery for retail estates and main contractors. Oxford Street and Westfield units through to office fit-outs in the City. All worked around trading hours.

Why London

Why choose us for interior decorating in London and Greater London.

Track record

  • Joinery, exposed steel, plaster and masonry handled on the same scope. One decorator, one handover
  • Designer-spec literate. We read the schedule, flag ambiguities in writing and never substitute a paint without sign-off
  • Two-pack epoxy and polyurethane capability where substrate or environmental exposure demands it

Right fit when

  • The finish needs to read as designed, not just painted. Sheen consistency and edge definition matter.
  • Multiple surface types share the space (drywall, MDF joinery, exposed steel, masonry) and need coordinated system selection.
  • The PC needs a decorator that survives QS scrutiny on the final inspection, not just the practical completion walk.

Scope · included

What you get when you brief us for interior decorating in London.

  • Wall, ceiling, joinery and detail decorating
  • Paint stack matched to the substrate (water-based, oil-based, two-pack)
  • Designer and brand specifications honoured. No substitutions without sign-off
  • Live snag list maintained through delivery, cleared before sign-off

Sectors · London

Types of building we cover with interior decorating in London.

  • Retail
  • Hospitality
  • Healthcare
  • Education
  • Office

London programme

How we run interior decorating schemes locally.

  1. 01 · Survey

    Substrate walk: plasterboard, MDF, exposed steel, masonry. Designer spec reviewed. Any ambiguity flagged in writing before mobilisation. Sample finish requirement agreed and cut on the actual substrate.

  2. 02 · Specification

    Stack per surface: walls in Diamond Matt or Sheen 4, joinery in Quick Dry Eggshell, exposed steel in two-pack epoxy or PU where the environment demands it. Sheen levels agreed against physical samples, not RAL codes on paper.

  3. 03 · RAMS

    RAMS written for the project: dust control in occupied environments, COSHH for any solvent or two-pack products, masking schedule per surface type. Issued before mobilisation.

  4. 04 · Delivery

    Phase by surface type: masking, prep, prime, top-coats, demask. Designer or PC walks the line at each phase, not just at practical completion.

  5. 05 · Handover

    Photo record, touch-up kit, dry-film record where two-pack systems were used. Live snag list cleared before sign-off.

Frequently asked · London

What clients in London usually ask first.

Are you based in London?
We're a southern-England contractor with a standing London programme. Mobilisation is typically same-week, with surveys inside 48 hours.
Can you work out-of-hours in central London?
Yes. Most of our London work is overnight or phased around live trading. The cost model assumes night works, not a variation bolted on later.
How do you handle ULEZ and the congestion charge?
All site vehicles are ULEZ-compliant. Congestion charge and parking sit inside the cost model from the start.
Can you work to a designer's finish schedule?
Yes. We read the schedule, query ambiguities in writing before mobilisation, sample-cut on the actual substrate, and never substitute a paint without the designer's sign-off.
What about joinery specified in oil-based finish?
Quick Dry Eggshell water-based is our standard. Same hardness as oil, no yellowing, dry within 4 hours. Traditional oil-based is available if the spec explicitly calls for it.
Can you do bespoke colour matching?
Yes. Pantone or RAL matched on site, sampled on the substrate and signed off before mobilisation. We carry mixing kit for minor site adjustments.
How do you specify exposed steel?
Two-pack epoxy or polyurethane for industrial or high-exposure environments, water-based hard-wearing for indoor commercial. We choose the system by exposure class.
What's the snagging process?
A live snag list is maintained by the site supervisor throughout delivery and cleared before handover. Anything that emerges after handover is dealt with as a priority.

Recent work

Recent work across Greater London.

Start a conversation

Send photos, drawings or a short scope.

We will review the service route, access, preparation, finish and likely next step before the job is priced properly.

CallGet a quote